Planning & budgeting
Program requirements, research, budget estimates, on-site analysis, and coordination of environmental studies before design starts.
Westland · Wayne County · ~17 miles from our yard
From planning and design through construction and closeout, CHC Total manages commercial projects for Westland property owners and tenants with one point of contact and a zero-defect goal.

CHC Total provides commercial construction for businesses in Westland, Michigan from our yard at 3701 Berry Rd in Ypsilanti, about 17 miles away. We serve Westland retail centers, light industrial, apartment communities along Ford Road and Wayne Road.
Westland projects include retail renovations, parking-lot concrete and paving, and site work for small industrial buildings.
Westland sits between Canton and Livonia along Ford Road and Wayne Road, with retail around Westland Shopping Center, industrial buildings near Cherry Hill and Newburgh, and quick access to I-275 and Detroit Metro Airport.
County: Wayne County
From our Ypsilanti yard: ~17 miles
Main corridors: Ford Road, Wayne Road, Warren Road, I-275
Nearby: Canton, Livonia, Garden City, Wayne, Inkster
Landmarks: Westland Shopping Center · Central City Park · Ford Road corridor
Program requirements, research, budget estimates, on-site analysis, and coordination of environmental studies before design starts.
Schedule and budget monitoring during design, engineering and life-cycle cost analysis, permit review, and early ordering of long-lead materials.
Pre-construction meetings, quality control, coordinated trades, schedule management, inspections against the contract documents, and regular progress reports.
Punch lists, record drawings, O&M manuals and warranties, testing and start-up supervision, a final project report, and warranty follow-through.
New construction, renovations, tenant build-outs, repairs, and service work for offices, retail, industrial, and institutional buildings — plus the site work, concrete, and demolition that go with them.
Yes. We can carry a project from programming and design through construction, or act as general contractor or construction manager on a design you already have. Compare delivery methods.
Every project has a site safety analysis and a project-specific safety plan, and crews hold daily safety meetings to review hazards and prevention before work begins.
Our crews and vendor network cover site work, concrete, iron and steel, drywall, trucking, electrical, plumbing, painting, carpentry, and flooring and tile.
CHC Total keeps Westland parking lots, truck docks, and walkways open around the clock — automatic service at 1½ inches, bulk salting from our own stockpile, and radio-dispatched response.
CHC Total installs and dismantles pallet racking and material-handling systems for Westland warehouses with experienced supervisors, certified forklift operators, and installers who are not temporary labor.
Construction, site work, snow, maintenance, and cleaning for Westland properties.